Wet Area Solutions 2018  ABN 35 610 903 921  1a/45 Bay Road Taren Point PO BOX 940 Cronulla 2230

  • Houzz Social Icon
  • Instagram Social Icon
  • Facebook

DIY Installation

tAKE A BREATH,
ARE YOU READY TO SAVE MONEY AND TIME?

The Following is a summary, for the full instruction manual please click here

RECCOMENDED TOOLS
 
1.sETUP FRAMING
 

Framing requirements:

Studs at 450mm or 600mm centres & Noggings at 600mm centres.

Double base plate 90mm for waterproofing

 
2.Waterproofing 

Waterproofing requirements:

Application of waterproofing as per the detail, with minimuim of 90mm waterproofing on baseplate.

 
2. hydro-lock

Installing Hydro-lock:

Installing hyrdo-lock, starting panels at approximately 45 degrees.

Ensure the tounge is fully inserted in the groove before snapping back to the wall.

 
3. Finish it off

YOUR ON THE HOME RUN!

Continue to measure and cut with precision, as you keep completing your bathroom walls. If it takes you longer than expected don't stress, it is your first time, so get it right.

For the full instruction manual please click here